Correct operation of HZS90 concrete batching plant in details
Time:2017-09-13
When using HZS90 concrete batching plant inspection, boot, shutdown, machine work is involved.
First,Before HZS90 concrete batching plant starting working,the operator should know about condition of the parts, performance, security situation, accomplish know fairly well, to ensure normal and safe operation of the machine.Concrete mixing plant before start production, controller, amplifier and sensors should be 20-30 minutes in advance all the way to open the power supply, preheated.Before the production of concrete batching plant, the check should implement the following items:
1, maintenance work with or without completion, finishing, repair parts, the package has all the recovery, maintenance site is cleared, with or without hinder the safety of production risks.
2, view the previous operation of the record whether the remaining problems, check the maintenance, maintenance records whether the remaining problems.
3, see the concrete mixing plant ingredients machine, host around the host and the following stent below the security obstacles, clean up the work with or without finishing.
4, check the batching plant tires show whether the abnormal, the working voltage is normal.
5, the integrity of the fill operation records, record the warm-up time, tare, start time.
Second,concrete batching plants according to the boot sequence boot, ready to mix and match the production process requirements of other work. Open the preparation and host to see if the motor is running properly, whether the belt deviation. Waiting for air pressure to 0.5Mpa or more, you can start the production process.
Finally,concrete mixing plant in the event of abnormal, emergency, should be dealt with in a timely manner; can not handle the report should be timely; concrete quality hazards should be remedied and recorded, can not be processed should be promptly requested. Production intermittent for more than an hour, should be placed in the water tank cans and drains the water inside the tank. After the concrete mixing plant is finished, it is should be put in the water to help clean up the site and maintain the work of the machine. After the completion of the batching plant in accordance with the shutdown sequence shutdown, finishing operation site, fill in the operation record.